There are two ways to determine connection to the grid price:
1. Public procurement. This method is applied if increased permissible capacity exceeds 500 kW. In that case household consumers pay 20 %, other consumers (except household) – 40 %, producers of electricity – 100 % of contractor's working price. Also, for project preparation household consumers get 40 %, other consumers – 10 % discount.
2. Formula and Commission approved fees. This method is applied if increased permissible capacity does not exceed 500 kW. Formula:
Price = Fee for 1 kW * Increased permissible capacity
+ Fee for 1 m * Shortest geometrical distance from connection point to consumer object
Connection fees approved by Commission (100 %):
I group (PC < 50 kW, no network reconstruction or project needed) | Eur | 28,13 | - |
| LTL | 97,13 | - |
|
II group (PC < 100 kW, network reconstruction and project needed) | Eur | 126,59 | 21,78 |
| LTL | 437,09 | 75,20 |
|
III group (100
<= PC
<= 500) | Eur | 52,10 | 22,52 |
| LTL | 179,89 | 77,76 |
Household customers pay 20% of the approved connection fee:
|
I group (PC < 50 kW, no network reconstruction or project needed) | Eur | 5,63 | - |
| LTL | 19,44 | - |
|
II group (PC < 100 kW) | Eur | 25,32 | 4,36 |
LTL | 87,42 | 15,05 |
|
III group (100
<= PC
<= 500) | Eur | 10,42 | 4,50 |
LTL | 35,98 | 15,54 |
*Fee for household consumers who prepare project themselves.
Example: Permissible capacity – 15 kW
No reconstruction or project needed
Connection price = 5,63 Eur * 15 kW= 84,45 Eur or 291,60 LTL
All other consumers except household consumers pay 40% of the approved connection fee:
|
I group (PC < 30 kW, no network reconstruction or project needed) | Eur | 11,25 | - |
| LTL | 38,84 | - |
|
II group (PC < 50 kW) | Eur | 50,64 | 8,71 |
LTL | 174,85 | 30,07 |
|
III group (50
<= PC
<=
100) | Eur | 20,84 | 9,01 |
LTL | 71,96 | 31,11 |
*Fee for all other consumers (except household consumers) who prepare project.
Example:
Permissible capacity – 15 kW
Network reconstruction and project needed
Shortest geometrical distance – 20 m
Project is prepared by consumer.
Connection price = 50,64 Eur * 15 kW + 8,71 Eur * 20 m = 933,80 Eur or 3224,15 LTL